四級沖刺練習閱讀(75)

            雕龍文庫 分享 時間: 收藏本文

            四級沖刺練習閱讀(75)

              In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

              There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

              After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

              After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

              In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

              1. The main difference between panel method and the method discussed in the last paragraph is_______.

              A. the latter uses ready-made internal features

              B. panels are cast in a level position

              C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

              D. the former is more expensive than the latter

              22. Which of these statements is TRUE of system building?

              A. It employs more men. B. It is difficult and dangerous.

              C. It can save both time and money. D. It means less mechanization.

              23. According to the passage, the principle of system building is that_______.

              A. construction methods are safer

              B. buildings are made from a set of standardized units

              C. similar buildings can be produced

              D. all units are produced on the site

              24. The usual fixed length in the modular system is_______.

              A. twenty centimeters B. ten millimeters

              C. fifty centimeters D. ten centimeters

              25. What lifts the concrete panels onto the building?

              A. Cranes. B. Man-power.

              C. Pulleys. D. Hydraulic jacks.

              21. A 22. C 23. B 24. D 25. A

              

              In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

              There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

              After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

              After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

              In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

              1. The main difference between panel method and the method discussed in the last paragraph is_______.

              A. the latter uses ready-made internal features

              B. panels are cast in a level position

              C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

              D. the former is more expensive than the latter

              22. Which of these statements is TRUE of system building?

              A. It employs more men. B. It is difficult and dangerous.

              C. It can save both time and money. D. It means less mechanization.

              23. According to the passage, the principle of system building is that_______.

              A. construction methods are safer

              B. buildings are made from a set of standardized units

              C. similar buildings can be produced

              D. all units are produced on the site

              24. The usual fixed length in the modular system is_______.

              A. twenty centimeters B. ten millimeters

              C. fifty centimeters D. ten centimeters

              25. What lifts the concrete panels onto the building?

              A. Cranes. B. Man-power.

              C. Pulleys. D. Hydraulic jacks.

              21. A 22. C 23. B 24. D 25. A

              

            主站蜘蛛池模板: 伊人激情AV一区二区三区| 国产MD视频一区二区三区| 人妻无码一区二区三区免费| 色窝窝无码一区二区三区| 亚洲国产AV无码一区二区三区| 日本一区二区高清不卡| 亚洲色精品vr一区二区三区| 在线播放精品一区二区啪视频| 国产a久久精品一区二区三区| 国产精品制服丝袜一区| 无码人妻少妇色欲AV一区二区| 精品综合一区二区三区| 国产在线精品观看一区| 欧洲精品一区二区三区| 韩国精品福利一区二区三区| 91大神在线精品视频一区| 中文字幕精品亚洲无线码一区应用| 国产大秀视频一区二区三区| 精品无码国产一区二区三区51安| 麻豆一区二区免费播放网站| av无码免费一区二区三区| 精品少妇人妻AV一区二区三区| 亚欧免费视频一区二区三区| 国产福利91精品一区二区三区| 精品国产鲁一鲁一区二区| 日本午夜精品一区二区三区电影| 亚洲综合无码一区二区三区| 亚洲综合无码一区二区三区| 亚洲欧美日韩国产精品一区| 国产品无码一区二区三区在线| 成人精品一区二区三区电影| 国产成人高清亚洲一区91| 日本精品一区二区三区视频| 日韩精品无码Av一区二区| 中文字幕无码一区二区三区本日| 中文字幕一区在线播放| 无码精品人妻一区二区三区人妻斩 | 免费国产在线精品一区| 福利片免费一区二区三区| 久久精品无码一区二区app| 无码人妻一区二区三区在线视频 |